Vehicle development

start now

LMX Projects as Powertrain Designer and Integrator

  • Powertrain development and integration for the electrification of vehicles up to 72V and 80kW.
  • Each iteration is completed within 4 to 6 months (Time to market).
  • High knowledge of category L approval and market constraints through LMX Bikes.

Vehicle scope

  • Vehicles <72V and up to 80kW
  • Category L approval
  • Veli (+ examples)
  • Other light vehicles (examples)

Research & Development

Design

System architecture (sizing)
Mechanical concept
Battery design
Electrical harness drawing

Prototyping

Gen 1 (5 months), Gen 2 (6 months)
Trials
Setting

Pre-industrialization

Production of prototypes

Industrialization

From the GEN 3 pre-series
At LMX: battery and mechanical interfaces
Subcontracting: bundles

Homologation

High expertise in category L

LMX proprietary bricks

Is your project more powerful?

Spark Racing Technology can support you on your high voltage project.
Scope: 400-800V nominal / Power > 50kW